SepcoTechEpoxy Solutions Contact us

Immediate repair · Pipe wrap (ballast pipes, cable pipes, cargo pipes, sea water pipes)

Pipe Wrap Repair: Full Epoxy Wrap Procedure

Full pipe wrap procedure for ballast pipes, cable pipes, cargo pipes and sea water pipes: surface preparation, epoxy coating and Super Wrap Reinforcement Tape.

Done by the crew on board, during voyage.Super Guard CoatingSuper Wrap Reinforcement Tape
Step-by-step illustration: Pipe wrap (ballast pipes, cable pipes, cargo pipes, sea water pipes)Step-by-step illustration: Pipe wrap (ballast pipes, cable pipes, cargo pipes, sea water pipes) (continued)
Illustrations from the SepcoTech epoxy instruction handbook. Includes AI generated images.

Step by step

1. Surface preparation

Surface preparations must always be in compliance with clients specifications or job requirements.

  • Inspect the pipe for corrosion, scale, coatings, oil, and contaminants.
  • Identify the repair area and extend the preparation area at least 10 cm. beyond the repair zone.
  • Remove oil, grease, salt, and contaminants before blasting.
  • Allow the surface to dry completely.
  • Start the rotating blaster and move it steadily along the pipe section.
  • Achieve a surface cleanliness equivalent to near-white metal.
  • Ensure the blasting produces a surface roughness profile of minimum 40 µm suitable for epoxy adhesion.

2. First layer of epoxy coating

  • Mix the coating out on to a mixing board or apply directly on the pipe.
  • Apply the epoxy coating evenly on the prepared pipe surface using a brush or a roller.
  • Aim to achieve a Wet Film Thickness of 400 µm.

Ensure:

  • Full coverage of the prepared surface.
  • No dry spots or air pockets.
  • The coating remains wet/tacky before wrapping.

Wrapping

  • Start wrapping from one end of the prepared area.
  • Maintain constant tension on the tape during wrapping.
  • Apply the tape with 50% overlap.
  • Allow semi-curing.

3. Second layer of epoxy coating

  • Mix the coating out on to a mixing board or apply directly on the first layer.
  • Apply the epoxy coating evenly on the prepared pipe surface using a brush or a roller.
  • Aim to achieve a Wet Film Thickness of 400 µm.

Ensure:

  • Full coverage of the prepared surface.
  • No dry spots or air pockets.
  • The coating remains wet/tacky before wrapping.

Wrapping

  • Start wrapping from one end of the prepared area.
  • Maintain constant tension on the tape during wrapping.
  • Apply the tape with 50% overlap.
  • Allow semi-curing.

4. Repeat

Same procedure continues until 4 layers of coating & 3 layers of Super Wrap Reinforcement Tape obtained.

Products used

  • Super Guard Blue 265 ml - item no. 10234
  • Super Guard White 265 ml - item no. 10233
  • Super Wrap Reinforcement Tape Small 5 cm x 10 m - item no. 10251
  • Static mixing nozzle - item no. 10260
  • Caulking gun - item no. 10263
  • Rotating Blaster Duo - item no. 10267
  • Bio Cleaner 0.5 l - item no. 10254

Products used

Get in touch

Describe the damage. We'll specify the repair.

Tell us the dimensions, whether the surface is wet or dry, and the operating temperature and pressure. We normally reply within one business day.

Request a quote or repair advice