SepcoTechEpoxy Solutions Contact us

Immediate repair · High pressure pipes

High Pressure Pipe Repair with Epoxy Shells

High pressure repair is a demanding task and must be carefully planned. Correct and proper surface preparation is required to achieve a good result.

Done by the crew on board, during voyage.Super Guard CoatingSuper Metal Filler CompoundSuper Wrap Reinforcement Tape
Step-by-step illustration: High pressure pipes
Illustrations from the SepcoTech epoxy instruction handbook. Includes AI generated images.

Step by step

  1. Surface preparation acc. SepcoTech recommendation Sa 2½ min. 40 µm.

  2. Prepare two pipe shells, Illustration 2, dimension half thickness of original pipe or minimum 3mm, allowing a gap of 4-10 mm between the surface of the pipe and the internal surface of the pipe shells. Carry out surface preparation on the internal surfaces of the shells.

  3. Apply SepcoTech Super Metal Filler into the areas and mount the shells as shown in illustration 3. Hold the shells in position by the use of pipe clamps or the like.

  4. Reinforce by wrapping 1 layer - Apply 500 µm SepcoTech Super Metal Filler st Wrap SepcoTech Super Wrap Reinforcement Tape into the Super Metal Filler Allow semi-curing 2 layer - Apply SepcoTech Super Guard Coating - 500 µm nd Wrap SepcoTech Super Wrap Reinforcement Tape into the coating Allow semi-curing 3 layer - Apply final layer coating rd Allow curing

Products used

Get in touch

Describe the damage. We'll specify the repair.

Tell us the dimensions, whether the surface is wet or dry, and the operating temperature and pressure. We normally reply within one business day.

Request a quote or repair advice